Thursday, May 9, 2024

SGR to be upgraded to electric line at Sh. 49 billion

Co-Op post

The Standard Gauge Railway (SGR) is set to be upgraded to an electric railway line at a cost of Sh. 49 billion.

The contractor, China Roads and Bridge Corporation will be offered 15 per cent of the current construction cost of Sh. 327 billion to carry out the upgrade.

The electrification of the line will be done on the Mombasa-Nairobi route.

Co-Op center

According to Transport cabinet secretary James Macharia, the locomotives will first be powered by diesel before the electrification is fully implemented.

Connect With Us

320,531FansLike
14,108FollowersFollow
8,436FollowersFollow
1,920SubscribersSubscribe

Latest Stories

Related Stories

error: Content is protected !!