Sunday, April 28, 2024

How to build standard three bedroom house with Sh. 1.9 million

Build Three Bedroom House: The cost of building a house largely depends on the materials and the cost of labour used. In this feature, a breakdown shows how you can build a standard three bedroom house with Sh. 1.990 million.

Breakdown:
Cement 281 bags =210,000
River Sand =122,000
Ballast =67,500
Foundation Stones =50,000
Hardcore 11,000
Gladiator (termite killer) =3200
BRC Mesh = 26,000
Timber and fascia =120,000
DPM = 9100
DPC =12500

10 Steps to Building a House [Without Spending a Fortune]

Kitchen Boards and sinks =50,000
Wardrobe boards = 30,000
Roof material (versatile) 80pcs =180,000
Machine cut stones 2800 stones =90,000
Tiles(30 by 30) 80 Boxes = 62,000
(60 by 60) 23 Boxes = 27,000
Bathroom tiles 14 Boxes = 10,920
Gypsum ceiling installation for sitting and dining 2,500/m² = 84,250
Wooden flowered chipboard for other rooms = 43,000
Doors = 40,000, Windows =90,000
Valley tray and ridge cap =20,000
Paints,primer & undercoat & brushes/rollers =80,000
Round poles = 6,000
Electric materials = 50,000
Wall pass 3 rolls = 9,000
All plumbing materials =60,000
Nails = 5,000
Y10 = 14,000, R6 = 6,000, Y12 9,500
Binding wire 10kgs = 1,500
Labour and transportation 300,000
Unknowns = 40,000
TOTAL 1,990,000.

Build Three Bedroom House: This breakdown was adapted from the a builders platform.

Did you love the story? You can also share YOUR story and get it published on Bizna Click here to get started.

Connect With Us

320,586FansLike
14,108FollowersFollow
8,436FollowersFollow
1,910SubscribersSubscribe

Latest

1 COMMENT

Comments are closed.

Related